This job was completed over 3 stages.
Stage One
Clearing & stump removal of a macadamia & mango plantation.
Stage Two
Bulk Earthworks: Cut the 65m x 25m arena pad & 65m x 35m shed pad. This required use of the dozers, padfoot roller, water cart & posi tracks. In addition to cutting the pads, we also constructed a secondary access road around the property boundary which included the installation of a twin concrete pipe crossing across the dam spill way.
Stage Three
Completing laser levelled arena surface & installing road base on the 250m secondary access road.
This job came with many challenges that All Aspects Earthworks had to overcome and work around. The biggest challenge was the property had an old timber bridge that was the only access for all materials. This required an engineer report & came back with a max weight of 20T to be brought across. To get all materials into the job this required the reloading of 1300T of road base, crusher dust & arena sand into 8t tippers.
ON SITE / 4 PHOTOGRAPHS
A closer look.
Select a photograph to view it in full.
HAVE A PROJECT IN MIND?
Let’s move
things forward.
A driveway, a dam, a fresh start for your property.
Tell Kane what you’re planning.
PROJECT ENQUIRY
Tell us about the job.
Share a few details and the team will be in touch.